Follow mikeobrien_fton on Twitter


Tuesday, April 13, 2010

Lots of Summer Work in Ward 3

Following is the list of major roads & streets, and water/sewer work, that is scheduled to take place this construction season in Ward 3:

ROADS & STREETS PROJECTS:
-Brookside Drive (West Hills Crossing to Summerhill Row) -Roadway reconstruction, including new curbs, granular, asphalt and storm sewer
-St. Marys Street -Culvert Replacement & Full Depth Asphalt Recycling using Expanded Asphalt (Co-op Driveway to North)
-Cherry Avenue/Fulton Avenue -Intersection upgrades to improve pedestrian safety
-Douglas Avenue (Brookside to Tim Hortons) -Asphalt resurfacing
-St. Marys Street (Union to Dedham) -Asphalt resurfacing
-Dedham Street (St. Marys to Cliffe) -Asphalt resurfacing
-Union Street (Friel to St. Marys) -Asphalt resurfacing
-Hilltop Drive (Cedar to MacDonald) -Asphalt resurfacing
-Park Street (MacDonald to End) -Asphalt resurfacing
-Killarney Lake Lodge Parking Lot -Placement of new asphalt concrete
-Carrington Lane (Fulton to Douglas) -Microsurfacing
WATER AND SEWER PROJECTS:
-Cityview Ave. - Pump Station #5 -Reconstruction of existing sanitary pumping station
-Longwood Drive (Fulton to Lilac East) - Watermain, Sanitary Sewer, Curbs, Granulars, and
Asphalt Reconstruction 2 (This is a major project and will necessitate the street being closed to
through traffic)
-Friel Street - Watermain and Sanitary Sewer replacement
-Unidirectional Watermain Flushing -Flushing of a watermain in a progressive pattern using clean water from a previously flushed section

No comments: